by Dutchland | Jul 30, 2020
Little Patuxent Water Reclamation Facility Description: As part of a CMAR delivery team with HDR and Clark Construction, Dutchland built three anaerobic digestion tanks for the Little Patuxent WRP in Howard County, MD. Dutchland served as the Structural Engineer of...
by Dutchland | Jul 30, 2020
Aquia WWTF Upgrade Project Description: In 1991, Dutchland constructed a precast post-tensioned SBR for the Leacock Township Sewer Authority with a capacity of 0.52 MGD. Seventeen years later in 2008, the Township invested in an upgrade and expansion on the...
by Dutchland | Jul 30, 2020
Fruitland WWTP Expansion & Upgrade Capacity: 1.4 MGD Sequencing Batch Reactor and Equalization Tank Description: The City of Fruitland, MD needed to expand the capacity of its wastewater treatment plant from 0.5 to 1.4 MGD and upgrade the level of treatment to...
by Dutchland | Jul 30, 2020
Town of Exteter, NH WWTF Upgrade Background: The Exeter WWTF has a design average capacity of 3 MGD, with a peak flow capacity of 7.5 MGD. The WWTF was constructed in 1965 and was upgraded in 1990 (lagoon expansion) and in 2002 (outfall upgrade). In 2010, the EPA...
by Dutchland | Jul 30, 2020
Earl Township Wastewater Facility Description: In 1995, Dutchland designed and constructed a wastewater treatment plant with an average daily flow of 0.48 MGD for Earl Township to serve the Gardenspot Village Retirement Community. The tank footprint measures 154’-2”...